Mid to End Of October Photos

With not not long to go until the 21st November opening, work is progressing on finishing off areas of the site such as the road and building the above ground structure for the petrol station. Work internally in the store itself is also well underway with shelving and units being fitted. I will continue to document the site from the outside documenting these changes.

Above is a view from the Underfleet coach park looking at the realm area with the store in the background.

Here is one of the new bus stops that is being built along with various other improvements being made currently along Harbour road.

In the photo above, a new layer of tarmac was being laid down on the access road and the junction with Harbour road.

Here is another view of the south of the store where checkouts are clearly visible through the glass. It is hard to think that just a few months ago from this same spot, all there was was sand.

Here is a view looking towards the west entrance of the store lobby, which looks more or less complete. All exterior and interior work around the site will be complete by the end of Sunday November 13th ready for all of the Tesco staff to move in at 6am on 14th of November to stock the store up ready for the grand opening the week after on the 21st.

The sound proof screening fence around the rear of the store has now been erected, hiding the service yard from the tramway and car park area.

Another view looking along the Realm area towards the south side of the store.

The photo above is another taken looking at the south east corner of the store, with the lobby exterior complete. The grey container on the right hand side could be what the ATM cash machines will sit in when they are put in place.

---------------------------------------------

Another iphone photo taken looking towards the store, with the light shining through the south side glass. This was taken from the 'realm' area looking through the fence which has been moved closer to the store. With the opening less than 4 weeks away, things are starting to look very smart and exterior landscaping is looking very good.

Above is a photo looking towards the store on my iphone. I used two exposures to make it, which is why you will notice some slight halos around objects in the photo. Lights were on in the store with work ongoing to install and fit the shelving, checkout's etc.

----------------------------------------------

Inside the 'realm' area above, where things are propped up against a fence, including a street sign that will be put back up when the fences come down.

Spray paint on the pavement showing the plan for this side of the pedestrian crossing.

In this photo, you can see part of Harbour road, where a pedestrian crossing is being built, there is also another crossing further east along Harbour road being built.

Another view along the access road from the junction. It looks like it is ready to be tarmacced now so that will probably be completed within a week or so.

The photo above is a view onto the south side of the site from Harbour road. This will be the area where one of the footpaths from the store will join the pavement.

Another view from the gate, looking across the 'realm' area towards the store.

Above is a view looking from the Underfleet towards the main store entrance. There isn't that much paving left to do outside now.

Here is a close up abstract photo of the side of the store, where I have used a diagonal angle and put the contrast of the lines and shapes against the plaint blue in the sky.

Above is a view of the west side of the store, where trees have been planted and surrounded with woodchippings.

Above is a view of the store looking across from the riverside workshops.

Another photo of the area outside the south eastern corner of the store which is more or less finished. Guys were working on the cladding on the porch area, which has the same wooden effect as the sides of the store. The exterior should be finished this time next week.

The photo above was taken looking at the south west corner of the store, where through the glass, you can see the area where the Costa coffee outlet will be located.

------------------------------------------------

Here is a view through a gap in the fence into the public space, with the access gate from the Underfleet at the back of the photo.

Here is a section of the public space between the Underfleet and the toilet block that has been finished, It looks quite good, but will be interesting to see when all of the fences have been taken down.

Another one of the regular views above looking into the public space, where paving work is almost complete.

A slightly creative photo here, looking along the tram lines towards the new Petrol Station Kiosk in the background.

Above is another view from Harbour road of the new road as it meets the new junction.

A tram passes by the western side of the store in the photo above.

Above is a view of the west side of the store, where young trees have been planted along the perimeter, making it look a lot more attractive from this side.

Above is a view across the store car park area where there is a lot of containers/equipment scattered across it. In the foreground, there is a big mound of earth which is being used in the landscaping around the site.

Another view of the south side of the store above, with some of the chiller and shelving units visible. In between them and the glass will be the store checkouts.

In this photo is someone working on a mini digger in front of the south side of the store. You may notice some of the internal shop fittings beyond the glass in the background.

Here is a view of the south west corner of the store, where the Costa coffee outlet will be. You can see that a lot of the paving work is complete with only a small area in front of the store remaining uncompleted.

Above is a clear view of the entrance area of the store, there will be doors on either end for people both coming from the town and the car park into the store.

In the photo above, I was looking towards the car park area with the south east corner of the store on the left hand side of the photo.

The photo above is from one of the regular spots, showing the main entrance area to the store.
----------------------------------------

The photo above was taken from above the caravan park at Beer head looking over towards Seaton. If you click on the photograph, you can clearly see the roof of the store off to the left of the centre. The grassy area for residential space sits behind the store in this view.

--------------------------------------------

Above is a view of what will be the petrol station. The fuel tanks below ground have been installed and surrounded in concrete and now the above ground structure is starting to appear. These are some of the posts that will hold the roof canopy up when the petrol station is complete.

Above is a fisheye view of the west side of the store with the tramway running from left to right in the foreground.

One of the external doors on the western side of the store have been fitted into place.

One of the regular photos above looking at the south east corner of the store, with the paved footpath from Harbour road coming in from the right hand side and more landscaping work on the area to the other side of it. Work is continuing on the entrance area of the store near the centre of this photo.

Another fisheye shot above, this time looking at the south facing side of the store with the paving in front of that and the newly landscaped area in the foreground.

Above is an over the fence view of the realm area, where it will join the Underfleet. You can see the majority of paving is complete as well as the pointing to fill gaps. The area at the top should be complete within the next week. Once that is complete, trees and plants can be put in areas where there are gaps.

Another view of the 'realm' area looking towards the toilet block which has had a clean on the outside. Paving has reached as far as the toilets in order for them to be opened again for public use as soon as possible. 

Above is one of the regular views looking into the public area, where the youth centre once was, paving is advancing towards this area and earth has been put down in the area on the left where the youth centre building was, ready for landscaping with trees, plants etc.

The photo above was taken at the road junction on Harbour road, using a wide angle fisheye lens. It shouldn't be that long before the road surface is laid.

Photos taken early to mid October 2011

This month will see a lot of finishing off happening around the store, such as landscaping, paving and finishing the access road. Work will also continue inside the store before it opens towards the end of next month. As always, I will be photographing everything I see from outside the site perimeter.


Above are two photos taken on my phone looking over the fence at the area next to the Underfleet, where paving is continuing at a quick pace, It should all be complete by this time next week.

---------------------------------------

Above is a view of the south side of the store looking from the tramway station. Just beyond the glass on this side of the store will be the area for the checkouts, with the Costa Coffee outlet in the south west corner of the store. In the foreground blue things have been placed in the ground presumably ready to hold trees and bushes.

Above is a view of the porch area where the public will walk through to the main entrance. The south side of the porch area has been fitted with window frames to allow more light through into this part of the store.

Looking at the practically complete western side of the store at the rear, where the fence is up and the sand banks have been covered up with soil, which will hopefully be planted up with plants etc soon.

Above is a view from the cliff above Seaton hole looking down on the town and the store with it's roof clearly visible.

I noticed this while I was walking along Harbour road. It looks like there will be a zebra crossing to allow pedestrians to cross the road close to the store. Further along on both sides of the road, there are markings on the pavements for bus shelters to be installed.

Another one of the regular views above looking at the south east corner of the store. Work is progressing on the landscape on the other side of the pathway, with window frames installed in the entrance porch area.

This is one of my regular spots since '08 looking at what now is the south of the store. You can see the landscaped area behind the wire fence which replaces the rather ugly looking wall that used to stand there.

Above is a wide angle view of the road junction of the access road and Harbour road, which is being leveled out smoothly before tarmac goes down on it. 

Another view in this area, but looking along the area towards the main store entrance, most of the paving the the area closest to the store has now been laid.

Looking through the gate with my shadow visible in the middle, is a photo of some of the paving slabs on a pallet waiting to be laid.

The photo above is looking towards the toilet block, which has been closed from the 10th October for a week, to enable landscaping work to progress around it. Paving work has also begun on the right hand side of the photo.

--------------------------------------

Here is a view looking from east to west across the site towards the main entrance to the store. The area in the foreground used to be where the infill lagoons were but is now growing with grass until it is developed for further use.

Above is a view of the south eastern corner of the store, where work is beginning on the porch area of the store. The main entrance will be slightly to the left of the glass you can see with the curved customer service desk sitting behind the glass area you see in this photo.

Here is a quick view of the rear of the store with most exterior work complete. Looking at the fence posts, you can judge for yourself how high the screening fence will be.

Above is a view of the west side of the store, where 2 panels await fitting into the gaps below the window frames to the right of the photo.

Above some workmen are working on the walls that back onto the service yard of the store, this area will be screened off from public view within the next few weeks.

Here is a glimpse into the side of the store where you can see some of the freezer cabinets sitting empty. Most of the main work inside the store is now complete, so shelves, cabinets etc will be moved into the store.

Above is the new temporary vehicle entrance to the site for works and delivery vehicles as work progresses on the road area behind it.

Here is a view on a Saturday afternoon, when most guys on site finish at 1pm. This is where the public 'realm' area will meet the underfleet.

This photo above was taken at the north west corner of the fence to the back of the store. They have left one of the tree stumps of the trees that used to line the tramway side of the site before work began at the start of this year.

-------------------------------------------

Below are a couple of links to some interactive 360 degree photos I have taken using my phone.

http://360.io/ScHg53

http://360.io/P9uwEk

http://360.io/gLPtQW

http://360.io/CAtJQX

---------------------------------------------

Above is a view looking from Harbour road directly down the new access road, towards the new roundabout at the other end.

When looking towards the car park area, I noticed these lights had been added to the poles, differing in style to the lights above the access road.

Here is a view looking north east across the site from Harbour road, where the hoardings have been removed on this side so that work to complete the road junction can continue.

Another photo above looking into the former youth centre area, where square areas are appearing lined with curbing where trees will be planted and then be surrounded with paving.

--------------------------------------------------

Above is one of the regular photos looking through the gate onto the former youth centre site, which is transforming quickly. This area will probably be fully paved within the next couple of weeks.

A view of the tramway side of the store where work is continuing on the bank. You can also see that a fence has been installed along the side here, which goes right around the back as well.

Workmen were working just the other side of the wall, in the shade from the sun, hanging their tops over the edge of the window frames.

A view into the south of the store, where you can see some of the internal aisles are starting to appear at the back side of the store.

A stack of paving slabs that have been cut up ready to use elsewhere.

One of the usual spots looking directly at the south side of the store as work continues on the public space area in front of the store.

A view across the site to the partially covered tesco sign backing on the south east corner of the store.

The photo above is a view looking directly at the new road where it meets Harbour road, a lot easier to see now that the fence has been taken down here.

Work was underway here in between the car park and the road to install some pipes, possibly for electricity to power lights etc.

This is a view looking from Harbour road at the new access road which is slowly edging it's way towards the new junction. You can see the sign for the roundabout that you can just make out the curbing for at the other end of the road.